Assembly Release QA Steps: Difference between revisions
From Genecats
Jump to navigationJump to search
m (→Introduction) |
mNo edit summary |
||
Line 22: | Line 22: | ||
The QA rock star can follow this guide in unison with a sync'd Google spreadsheet checklist, simply by copying the spreadsheet template. These wiki steps are automatically populated in the spreadsheet as a checklist, and therefore will always be in sync with the wiki. | The QA rock star can follow this guide in unison with a sync'd Google spreadsheet checklist, simply by copying the [http://genomewiki.ucsc.edu/genecats/index.php/Assembly_QA_Part_1_DEV_Steps#Setup:_Create_a_Google_spreadsheet_checklist_from_a_template super fancy-pants spreadsheet template]. These wiki steps are automatically populated in the spreadsheet as a checklist, and therefore will always be in sync with the wiki. | ||
Revision as of 02:09, 24 May 2017
Navigation Menu |
See also: Releasing an assembly (old steps)
Introduction
When a developer is ready for a new assembly to be released, a member of the QA team will QA and release the assembly. This wiki section exists as a guide for the assembly QA and release process.
The QA rock star can follow this guide in unison with a sync'd Google spreadsheet checklist, simply by copying the super fancy-pants spreadsheet template. These wiki steps are automatically populated in the spreadsheet as a checklist, and therefore will always be in sync with the wiki.
🔵 Ready to get started? Go to Assembly QA Part 1: DEV Steps